Tasks - DEADLINE 22.04.2014
(Submission via Confluence)
T1A1: Important Thoughts
Write down in own words why the railway installation is a) a real-time system, b) an embedded system, and c) a safety-critical system.
...
...
(Submission via Confluence)
Write down in own words why the railway installation is a) a real-time system, b) an embedded system, and c) a safety-critical system.
...