Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Write down in own words why the railway installation is a) a real-time system and , b) an embedded system, and c) a safety-critical system.

 

T1A2: C Interface

...