Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Write down in own words why the railway installation is a) a real-time system, b) an embedded system, and c) a safety-critical system.

 

T1A2: C Interface

Since you have already checked out the project's repository, you also downloaded the c interface of the railway installation. Look inside the railway folder inside your local repository clone. You will find the example controller presented at the kickoff meeting the RailwayControllerC folder. Use this stub to create your own railway controller.

...