Tasks - DEADLINE 22.04.2014

T1A1: Important Thoughts

Write down in own words why the railway installation is a) a real-time system, b) an embedded system, and c) a safety-critical system.

...

Before writing the c code make a plan how to achieve the task. Which tracks and point switches must be set when. Write down your plan briefly and program your controller. Eventually, test your controller with the simulation environment and the modelGUI.

T1A3: Reality vs. Simulation

Subsequent to fixing superflous mistakesbugs (in A2), what can you observe?  Write down all things that differ from your initial expectations and try to explain why the railway/simulation did behave in a different way. Additionally list all differences that you that you expect to exist between the simulation and the real model railway. Therefore inspect the railway documentation and experiment with the simulation (sources).